Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Abdel-Monem, M and Hegazy, T (2013) Enhancing Construction As-Built Documentation Using Interactive Voice Response. Journal of Construction Engineering and Management, 139(07), 895–8.

Aljassmi, H and Han, S (2013) Analysis of Causes of Construction Defects Using Fault Trees and Risk Importance Measures. Journal of Construction Engineering and Management, 139(07), 870–80.

Chen, L and Fong, P S W (2013) Visualizing Evolution of Knowledge Management Capability in Construction Firms. Journal of Construction Engineering and Management, 139(07), 839–51.

  • Type: Journal Article
  • Keywords: Construction companies; Contractors; Business management; Knowledge-based systems; Dynamic capabilities; Learning mechanisms; Knowledge management; Performance evaluation; System dynamics modeling;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000649
  • Abstract:
    A firm, as a dynamic, evolving, and quasi-autonomous system of knowledge production and application, develops knowledge management capability (KMC) through strategic learning to sustain competitive advantages in a dynamic environment. Knowledge governance mechanisms and knowledge processes connect and interact with each other, thereby forming learning mechanisms that execute double-loop learning. This in turn drives the genesis and evolution of KMC to modify operating routines that contribute to the desired performance. This paper reports a study that was performed within a context of construction contractors, a type of project-based firm, which operates within the dynamic Hong Kong construction market. The writers used a multiple-case design to incorporate evidence from the literature and interviews, with the help of system dynamics modeling, to visualize the evolution of KMC. The writers’ paper demonstrates the feasibility of visualizing how a firm’s KMC correlates with its operating environment over time. The findings imply that knowledge management (KM) applications can be better planned and controlled through evaluation of KM performance over time from a capability perspective.

Chen, Q and Jin, R (2013) Multilevel Safety Culture and Climate Survey for Assessing New Safety Program. Journal of Construction Engineering and Management, 139(07), 805–17.

Chi, S, Han, S and Kim, D Y (2013) Relationship between Unsafe Working Conditions and Workers’ Behavior and Impact of Working Conditions on Injury Severity in U.S. Construction Industry. Journal of Construction Engineering and Management, 139(07), 826–38.

Dai, F and Lu, M (2013) Three-Dimensional Modeling of Site Elements by Analytically Processing Image Data Contained in Site Photos. Journal of Construction Engineering and Management, 139(07), 881–94.

El-Abbasy, M S, Zayed, T, Ahmed, M, Alzraiee, H and Abouhamad, M (2013) Contractor Selection Model for Highway Projects Using Integrated Simulation and Analytic Network Process. Journal of Construction Engineering and Management, 139(07), 755–67.

El-Diraby, T E (2013) Domain Ontology for Construction Knowledge. Journal of Construction Engineering and Management, 139(07), 768–84.

Hare, B, Cameron, I, Real, K J and Maloney, W F (2013) Exploratory Case Study of Pictorial Aids for Communicating Health and Safety for Migrant Construction Workers. Journal of Construction Engineering and Management, 139(07), 818–25.

Liu, Y S, Zhao, X F and Liao, Y P (2013) Market Structure, Ownership Structure, and Performance of China’s Construction Industry. Journal of Construction Engineering and Management, 139(07), 852–7.

Migliaccio, G C, Guindani, M, D’Incognito, M and Zhang, L (2013) Empirical Assessment of Spatial Prediction Methods for Location Cost-Adjustment Factors. Journal of Construction Engineering and Management, 139(07), 858–69.

Rezazadeh Azar, E, Dickinson, S and McCabe, B (2013) Server-Customer Interaction Tracker: Computer Vision–Based System to Estimate Dirt-Loading Cycles. Journal of Construction Engineering and Management, 139(07), 785–94.

Zhang, L, He, J and Zhou, S (2013) Sharing Tacit Knowledge for Integrated Project Team Flexibility: Case Study of Integrated Project Delivery. Journal of Construction Engineering and Management, 139(07), 795–804.